  1. The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build. It is 640 m (2,100 ft) long and is 178 m (584 ft) high.

  2. 9 lip 2018 · The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build. It is 640 m (2,100 ft) long and is 178 m (584 ft) high.

  3. The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build.

  4. 11 sty 2009 · The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build. It is 640 m (2,100 ft) long and is 178 m (584 ft) high.

  5. 23 sie 2007 · The El Cajon hydroelectric project has recently been constructed in the Mexican state of Nayarit. The project is located approximately 80km east of Tepic city, on the Santiago river, 60km upstream of the existing Aguamilpa project.

  6. The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build. It is 640 m (2,100 ft) long and is 178 m (584 ft) high. The reservoir holds approximately 5,000,000,000 m

  7. El Cajon Dam, located at a distance of 250 km to the Northwest of Guadalajara City, the second in importance of Mexico, is the highest CFRD built in México with maximum dam height of 188m and crest length of 550m.