Yahoo Poland Wyszukiwanie w Internecie

Search results

  1. The Seawolf class cost about $3 billion per unit ($3.5 billion for USS Jimmy Carter), making it the most expensive United States Navy fast attack submarine and second most expensive submarine ever, after the French Triomphant-class nuclear-powered ballistic missile submarines.

  2. 27 lut 2021 · The first of its class, the USS Seawolf was laid down in 1989 and cost estimates for the class in 1991 were estimated to be around $33.6 billion or roughly 25% of the naval construction...

  3. The Seawolf class cost about $3 billion per unit ($3.5 billion for USS Jimmy Carter), making it the most expensive SSN submarine and second most expensive submarine ever, after the French SSBN Triomphant class.

  4. The Virginia class was intended in part as a less expensive alternative to the Seawolf-class submarine ($1.8 billion vs $2.8 billion), whose production run was canceled after just three boats had been completed.

  5. With the end of the Cold War and the change of emphasis to littoral operations, the cost of the Seawolf submarines was judged prohibitive and the programme was curtailed in favour of the smaller and cheaper Virginia class New Attack submarines.

  6. Seawolf (SSN 21) was commissioned on 19 July 1997 at Electric Boat Shipyard. Seawolf was projected to be the most expensive ever built, with a total program cost for 12 submarines estimated in 1991 at $33.6 billion in current dollars. As many as 29 submarines were planned.

  7. Seawolf was projected to be the most expensive ever built, with a total program cost for 12 submarines estimated in 1991 at $33.6 billion in current dollars. As many as 29 submarines were...

  1. Ludzie szukają również