If workers are no longer present but road or work conditions require the traffic control in advance of the area of crew exposure without adversely affecting the performance or quality of 6.
Traffic control plans (TCP) detail how construction of project improvements will be accomplished. TCP should maximize traffic operations and safety, and should maximize construction worker safety during construction. Details may be needed for parallel routes or shifted traffic on existing pavement.
Traffic Standards (English) Last Update: Thursday, October 17, 2024. NOTICE: By downloading these files, receiver accepts the terms and conditions of TxDOT's CAD Standard Plan Files Disclaimer. INSTRUCTIONS: Click on the MicroStation (DGN) filename to download.
Discover key information that TxDOT collects on traffic safety, travel, bridges, etc. Study our various maps, dashboards, portals, and statistics. Data and maps ; Reference maps; Traffic count maps; Official travel maps; Roadway inventory; One-stop demographic data analysis tool; Global Positioning System (GPS) Crash reports and records
The Engineer will determine if the LEAD VEHICLE and/or TRAIL VEHICLE are required based on prevailing roadway conditions, traffic volume, and sight distance restrictions. The use of amber high intensity rotating, flashing, oscillating, or strobe lights on vehicles are required.
TxDOT TPP Web Map for Viewing Annual Average Daily Traffic (AADT). This map is updated annually to reflect the latest available AADT data.
The Statewide Planning Map application contains the following TxDOT maps. (TxDOT's map application performs best with Chrome, Firefox and Internet Explorer 11.0 or better.) Council of Governments (COG). Control sections. Future traffic estimates. Highways. Imagery.