Yahoo Poland Wyszukiwanie w Internecie

Search results

  1. Integrated Transit Map. For LRT, MRT, Monorail Lines & BRT Sunway Line . Click on the zoom control to expand and center the map. For (downloadable) PDF version, please click the button below.

  2. The Kuala Lumpur and Klang Valley LRT, MRT, Monorail, BRT, Komuter, and ERL network is currently run by 4 public transport operators – Keretapi Tanah Melayu Berhad (KTMB), Rapid Rail Sdn Bhd (Rapid KL), Rapid Bus Sdn Bhd (Rapid KL), and Express Rail Link Sdn Bhd (ERL).

  3. The first stop of the 4 MRT & LRT route is Putra Heights and the last stop is Sentul Timur. 4 (Sentul Timur) is operational during everyday. Additional information: 4 has 29 stations and the total trip duration for this route is approximately 72 minutes.

  4. Rapid KL’s LRT operation is run by Rapid Rail Sdn Bhd, which is responsible for overseeing the urban rail lines of Ampang Line and Sri Petaling Line, Kelana Jaya Line, other than the Monorail Line services. The LRT Ampang Line and the LRT Sri Petaling Line combined network comprises 45.1 kilometres of tracks (28.0 miles) with 36 stations.

  5. Masjid: connects directly with the Jamek route 4 station. Pasar Seni: At 250m from the station’s exit is the Kuala Lumpur stop for routes 1 and 2. KL Sentral: Connects with routes 1 and 2, plus it has direct access to the express service that goes to the airport. Outside of the station, at 200m away, the user will also find a monorail station.

  6. Informasi Peta | Map Information. Waktu Operasi Perkhidmatan/ Service Operating Hours. Isnin – Sabtu/ Monday – Saturday: Ahad dan Cuti Umum/ Sunday and Public Holidays: 6:00 pagi/ am - 12:00 tengah malam/ am 6:00 pagi/ am - 11.30 malam/ pm. 03 7885 2585.

  7. Route 4: LRT Sri Petaling Line (LRT Laluan Sri Petaling) for LRT trains between Putra Heights station to Sentul Timur station. Route 5: LRT Kelana Jaya Line (LRT Laluan Kelana Jaya) for LRT trains between Putra Heights station to Gombak station.

  1. Ludzie szukają również