Search results
1 kwi 2021 · A 35-year period of as-built data from 1983 to 2017 was analyzed, involving 37 treatment strategies with 17 for asphalt and 20 for Portland Cement Concrete (PCC) pavements.
1 paź 2013 · PDF | On Oct 1, 2013, Mijia Yang and others published Survey and Literature Review of Fast-Track PCC Pavement Repair Processes and Materials | Find, read and cite all the research you need...
It involved a detailed evaluation and analysis of the PCC pavement data in the Long-Term Pavement Performance (LTPP) database using a variety of methods to determine the design features and practices that have beneficial effects on long-term performance.
22 3.2: CALIBRATION The key input data used in the HDM PCC pavement deterioration models are related to the conditions of climate and environment, dowel use, traffic, pavement history, pavement geometry, pavement structural characteristics, and material properties.
The history of portland cement concrete over portland cement concrete (PCC/PCC) composite pavements in the United States dates back to the first concrete pavement constructed in the United States, located in Bellefontaine, OH, in 1891, shown in Figure 1.
This report documents recommendations for the design and construction of portland cement concrete (PCC) pavements. The recommendations were derived from the analysis of Long-Term Pavement Performance (LTPP) data.
1 kwi 1998 · It involved a detailed evaluation and analysis of the PCC pavement data in the Long Term Pavement Performance (LTPP) database using a variety of means to determine the beneficial effects of design features and construction practices on long-term performance.