Search results
The purpose of this research was to identify flexible and rigid pavements in Ohio with average and above average performance, and determine reasons for these differences in performance. The identification and implementation of
Volume 1 of the report includes: the project selection process, FWD and ride quality data, laboratory results of testing on base, subgrade and asphalt concrete pavement samples, and projected services lives using FWD data and the MEPDG.
The first PCC pavement in the U.S. was constructed in 1891 in Bellefontaine, Ohio. This pavement was only 3.0 m wide and 67.1 m long (probably what we would call a “test section” today). In 1909, in Wayne County, Michigan, a PCC highway system was constructed.
the pavements selected for study indicates pavement design procedures used in Ohio are meeting expectations. Among the items recommended to improve pavement performance include: 1) maintaining subgrade uniformity to minimize
1 wrz 2010 · By identifying these reasons and implementing them into standard practice, the overall performance of pavements in Ohio can be improved in the future.
The history of portland cement concrete over portland cement concrete (PCC/PCC) composite pavements in the United States dates back to the first concrete pavement constructed in the United States, located in Bellefontaine, OH, in 1891, shown in Figure 1.
1 lut 2014 · This paper presents the performance of seventeen rigid pavements made of Portland Cement Concrete (PCC) located in the State of Ohio, USA. The Falling Weight Defectlometer (FWD) testing...