Search results
1 kwi 2021 · A 35-year period of as-built data from 1983 to 2017 was analyzed, involving 37 treatment strategies with 17 for asphalt and 20 for Portland Cement Concrete (PCC) pavements.
Provide examples to assist agencies with integrating pavement construction history into a pavement management system. Illustrate different ways to capture maintenance and construction history data. Demonstrate why construction history is critically important to pavement management.
The history of portland cement concrete over portland cement concrete (PCC/PCC) composite pavements in the United States dates back to the first concrete pavement constructed in the United States, located in Bellefontaine, OH, in 1891, shown in Figure 1.
Appendix A1 includes HMA and PCC pavement performance criteria summarizing the range of common indicators, measurements, potential causes, and fixes applicable to pavement warranty types based on the Distress Identification Manual for the Long-Term Pavement Performance Program (Miller and Bellinger, 2003) and other sources (Washington State DOT ...
The levels and longevity rates for the longitudinally tined PCC pavement were derived from the Caltrans Quieter Pavement Research work on the Mojave Bypass (58), the data for the ground PCC pavement were taken from test sections measured in Kansas on US 69 (59), and data for the random transversely tined pavement were from I-70 in Ohio (48 ...
Almost all rigid pavement is made with Portland Cement Concrete (PCC). Rigid pavements are differentiated into three major categories by their means of crack control: Jointed plain concrete pavement (JPCP) This is the most common type of rigid pavement.
WSDOT is undertaking a major effort to identify both rehabilitation and reconstruction projects to improve its PCC pavements. This project was performed to estimate WSDOT’s concrete pavement performance. The current PCC pavement conditions were thoroughly analyzed.