  1. 2024 Roadway Standard Drawings - Index of Sheets. Division 02 - Earthwork. Division 03 - Pipe Culverts. Division 04 - Major Structures. Division 05 - Subgrade, Bases and Shoulders. Division 06 - Asphalt Bases and Pavement. Division 07 - Concrete Pavements and Shoulders.

  2. 2018 Roadway Standard Drawings. 2018 Roadway Standard Drawings - Index of Sheets. Division 02 - Earthwork. Division 03 - Pipe Culverts. Division 04 - Major Structures. Division 05 - Subgrade, Bases and Shoulders. Division 06 - Asphalt Bases and Pavements. Division 07 - Concrete Pavement and Shoulders. Division 08 - Incidentals Part 1.

  3. connect.ncdot.gov › letting › Division 3 LettingCURB RAMP DETAIL - NCDOT

    23 lut 2017 · 6" x 12" CONCRETE CURB. 2. CURB AND GUTTERSIDEWAL. WIDTH 5’ MIN.6" CONCRETE CURB S. PAY LIMITS FOR 1 OR 2 CURB RAMPS. 1 8.33% (12:1) MAX RAMP SLOPE. SS SLOPE: 2.00%3 CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM T. RNING MANEUVERS. SLOPE.

  4. 14 maj 1999 · 10% 10%. 3 10% 8.33%. M AX RAMP SLOPE (TYP) 10% DEPRESSED 2’-6" CURB & GUTTER SIDEW ALK WIDTH 5’ MIN. PROJECT REFERENCE NO. SHEET NO. 2022CPT.08.18.10191, etc.

  5. Explore and analyze geographic data with ArcGIS's interactive map viewer.

  6. directional ramps 2 3 cross slope: 2.00% slope to drain to curb. of 2.00% where pedestrians perform turning maneuvers. with a maximum cross slope and longitudinal slope curb ramps require a (4’-0") minimum landing 8.33% (12:1) max ramp slope refer to roadway standard drawing number 848.05 sheet 3 of 3 for all ramp notes pay limits for curb ...

  7. 18 sie 2022 · Generally, the government must provide curb ramps wherever a sidewalk or other pedestrian walkway crosses a curb. But they are also required when necessary to allow a person with a mobility disability to travel from a sidewalk on one side of the street to the far side of the street.