Search results
9 wrz 2024 · Deck bracing ensures your deck is structurally sound. Learn how to install bracing to provide extra strength against high winds & keep your deck from swaying.
Bracing needed if over 2 m from building Paragraph 7.4.2.1 states that no bracing is required when a deck projects less than 2.0 m from the building and is attached to the building on one or more sides. The bracing provided by the building will satisfy the bracing requirements for the deck.
Brace Angle: Install the brace at an angle of between 40 and 50 degrees to the horizontal if possible. Otherwise, the minimum is 30 degrees, maximum 60 degrees. Strap Tensioning: Ensure each length of Strap Brace has a Pryda Tensioner, properly tightened prior to nailing. Tension Speedbrace by hammering it flat over each stud and wall plate.
Bracing is most eficient when placed at angles between 30° and 60°. With steeper bevels, the end connections can be cumbersome. Any brace configuration can be used to make up a horizontal bracing system, as long as a complete load path is available to transfer the load into the lateral load resisting system.
bracing is effective only if the horizontal is very stiff or if it is tied by a second horizontal. Bracing that is required only for construction purposes may be removed once construction is complete if it impedes maintenance opera-tions or adversely affects the performance of the bridge in service. However, it is often
The structure that supports a deck looks pretty simple at a glance. But building a safe and durable deck requires good planning, careful material choices, and attention to detail —especially structural details that are sometimes overlooked by both owner-builders and contractors.
Horizontal bracing. At each floor level, bracing in a horizontal plane, generally provided by floor plate action, provides a load path to transfer the horizontal forces (mainly from the perimeter columns, due to wind) to the planes of vertical bracing.