Search results
Furnace Twinning Installation Manual. The Goodman literature library has consumer brochures and technical specifications for various Goodman HVAC models and product lines.
INSTALLATION INSTRUCTIONS. WARNING. BEFORE INSTALLING THIS KIT OR SERVICING THE UNIT, DISCONNECT ALL POWER TO THE UNIT. FAILURE TO FOLLOW THIS WARNING MAY RESULT IN PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO ELECTRICAL SHOCK. See HEAT KIT SELECTION to select an approved kit for each model. HEAT KIT SELECTION. Note:
kW 19 19.2 kW wth 150F limit C C Cabinet 06 6.0 kW 20 19.2 kW with 170F limit D D Cabinet 08 8.0 kW 25 25.0 kW X All Cabinet Sizes 10 9.6 kW Heating kW Correction Factor Supply Voltage 240 230 220 210 208 Correction Factor 1.00 0.92 0.84 0.77 0.75 Multiply the 240-volt heating capacity by correction factors.
1. Follow steps 1 through 4 from “Standard Air Handler Installation” section. 2. Using the two 1" screws provided, mount the terminal block on the right hand side of the heater panel on the airhandler (mounting holes are provided). 3. Wire the terminal block leads to the transformer as per the wiring diagram. 4.
View and Download Goodman GSZ/VSZ 13 SEER technical manual online. GSZ/VSZ 13 SEER Series Split System Heat Pumps. GSZ/VSZ 13 SEER heat pump pdf manual download.
The Goodman® brand HKR electric heat kits are for use with Amana brand air handlers and modular blowers. The HKS heat kits are designed for use with packaged electric/heat pump units. These versatile heat kits are designed for easy installation in the field.
This guideline will cover installation requirements and additional accessories needed for split system installations where the line set exceeds 80 feet (24.4 m) in actual length.