Search results
Find out the estimated generation and water release at Denison Dam and other projects in the Southwestern Power Administration area. Call 866-494-1993 or check the online links for the current day schedule.
3 dni temu · Reservoir release is 19 cubic feet per second on Tuesday 12Nov2024 23:00. Conservation pool is 93.65% full. Conservation pool storage filled is 1472097 acre-feet which is equivalent to 0.82...
2 dni temu · Gage(s): DENI. Latest 1 hour data for: Today at 10:15 PM. Number of turbines online: 0 / 2. Latest headwater elevation: 617.17 ft. Today at 10:15 PM. Latest tailwater elevation: 501.07 ft. Today...
The values in the projected loading schedule indicate the generating capacity rate in megawatts (MW) for each project. The water discharge from each project is measured in cubic feet per second (CFS). Additionally, all generation releases posted above are subject to change.
Hydropower Generation Schedules. To view a hydropower generation schedule, select a power plant and date from the dropdowns. The schedules are updated daily. All times are listed in local...
Data processed at Thu 14Nov2024 01:09 GMT. Page Navigator. Upstream stations: CWRO2 :Washita Rv at Cumberland Cut, nr Cumberland, OK, Hwy 199. GSVT2 :Red River, Gainesville, TX. Downstream...
15 lis 2024 · The top of the Denison Dam is 670 ft. Water goes over the spillway at 640 ft. The Lake Texoma elevation hit a record high of 645.49 on May 29, 2015. The Roosevelt Bridge closed on May 30, 2015 when the lake level reached 645.66 ft. Lake Texoma crested June 1, 2015 at 645.72.