Search results
Moderate Flood: 24.6 Feet. Major Flood: 25.6 Feet. Plot Type: Ensemble Forecast Deterministic Forecast Raw Observations. Scale to Flood Thresholds. Export Graph as PNG Image. Forecast Posted: 10/30/2024 at 7:44 AM PDT Graphic Created: 10/30/2024 at 7:52 AM PDT. View as data table, Bear Creek - McKee Road (MEEC1)River Forecast Plot.
3 lis 2022 · The project will cover a 6-mile stretch of Bear Creek, from the bridge at McKee Road to the bridge at 16th Street. Teams will remove trash and invasive plants and overgrowth that are dominating the area and crowding out the Creek’s natural habitat.
24 paź 2022 · Merced, Calif. (October 24, 2022) – Assembly Member Adam Gray (D-Merced) will join the City of Merced in announcing the Bear Creek Restoration Project launch Tuesday, October 25, 2022, at 10 am at Albert Lawson Park on 28 th Street in Merced. The park is accessible between H and I Streets.
9 lip 2014 · Bear Creek Bikeway spans 3.6 from McKee Rd. and S. Bear Creek Dr. to Black Rascal Creek Bikeway at W. Olive Ave. and Snelling Hwy./SR 59. View amenities, descriptions, reviews, photos, itineraries, and directions on TrailLink.
Street flooding occurs primarily north of Bear Creek Drive and east of M Street. 16.0 Feet South bike path along Bear Creek floods downstream of the G Street bridge.
26 paź 2022 · 209-385-2461. Leaders in Merced say $6 million has been secured to use restore a large section of Bear Creek, which many residents use for recreation.
Street flooding occurs primarily north of Bear Creek Drive and east of M Street. 16.0 Feet South bike path along Bear Creek floods downstream of the G Street bridge.