Yahoo Poland Wyszukiwanie w Internecie

Search results

  1. 13 godz. temu · With increased passenger volume resulting from the transfer of international scheduled passengers from Mirabel Airport in 1997, as well as Air Canada's intentions to make Montréal–Trudeau its Eastern Canada hub, there was a strong need to greatly expand the terminal, whose capacity of roughly 7 million passengers per year had been exceeded.

  2. 13 godz. temu · The budget for the expansion is US$3.5 billion. Much larger in size and scale than the other two terminals, Terminal 3 was the largest airport terminal-building complex in the world to be built in a single phase, with 986,000 m 2 (10,610,000 sq ft) in total floor area at its opening.